Your browser does not support JavaScript!
Industrial Management
:::
 
 
Ying-Mei Tu

 

Ying-Mei Tu
Title
Professor
Office
M529
Office Tel.
03-5186067
Fax
03-5186067
E-Mail
email
Lab
Performance Evaluation and System Simulation Lab
Research
research
Diploma (Undergraduate)
Degree
Department
University
Bachelor
Industrial Engineering & Management
National Chiao Tung University
Diploma (Master)
Master
Industrial Engineering
National Chiao Tung University
Diploma
(Ph.D.)
Ph.D.
Industrial Engineering & Management
National Chiao Tung University
Work Experience
Position
Company
Technical Manager
TSMC
 
 
Research Interests
Production Management and Shop Floor Control
Semiconductor Manufacturing Management
Supply Chain Management(SCM)
Enterprise Resource Planning(ERP)
Courses Taught
Production Planning and Control
Manufacturing Management of Semiconductor
Facility Planning
Shop Floor Control of Semiconductor
System Simulation
 

 

Jounal Paper
 

Rong-Kwei Li, Ying-Mei Tu and Tao H Yang (1993), "Composite Feature and Variational Geometry Concepts on Feature-based Design System," International Journal of Production Research, Vol. Vol. 31, No. No. 7, pp. 1521-1549. (SCI)

 
 

Ying-Mei Tu and Rong-Kwei Li, (1998), "Constraint Time Buffer Determination Model," International Journal of Production Research, Vol. Vol. 36, No. No. 4, pp. 1091-1103. (SCI)

 
 

Chang, S.-H., Y.-M. Feng, Y.-M. Tu, C.-L. Huang and R.-K. Li (1999), "A TOC-Based Dispatching Rule for Semiconductor Wafer Fabrication," Journal of the Chinese Institute of Industrial Engineering, Vol. 2, No. 16, pp. 209-220. (TSSCI)(In Chinese)

 
 

Ying-Mei Tu, Yu-Hsiu Chao, Sheng-Hung Chang and Huan-Chung You (2005), "Model to Determine the Backup Capacity of a Wafer Foundry," International Journal of Production Research, Vol. Vol. 43, No. No. 2, pp. 339-359. (SCI)

 
 

Yung-Hai Yen, Sheng-Hung Chang, Ying-Mei Tu and Rong-Kwei Li (2005), "An Application of Theory of Constraints in Product Mix ─ A case of IC Lead Frame Factory," Ming Hsin Journal, Vol. , No. 31,, pp. 147-160. (In Chinese)

 
 

Ying-Mei Tu and Chuen-Shiuan Liou (2006), "Capacity Determination Model with Time Constraints and Batch Processing in Semiconductor Wafer Fabrication," Journal of the Chinese Institute of Industrial Engineers, Vol. Vol 23, No. No 3, pp. 192-199. (TSSCI)

 
 

Sheng-Hung Chang, Nan-Hao Sung and Ying-Mei Tu (2006), "Establish Robust Project Management System by Using Critical Chain Methodology," Ming Hsin Journal, Vol. , No. 32, pp. 289-309. (In Chinese)

 
 

Po-Hsien Kuo, Ying-Mei Tu, Sheng-Hung Chang, and Rong-Kwei Li (2008), "A Research on Decision Support System for New Product Project Portfoliy," Ming Hsin Journal, Vol. No. 1, pp. 107-126, No. Volume 34, pp. 107-126. (In Chinese)

 
 

Ying-Mei Tu and Hsin-Nan Chen (2009), "Tool Portfolio Planning In The Back-End Process of Wafer Fabrication With Sequential Time Constraints," Journal of the Chinese Institute of Industrial Engineers, Vol. Vol. 26, No. No. 1, pp. 60-69. (EI)

 
 

Ying-Mei Tu and Hsin-Nan Chen (2009), "Capacity Planning With Sequential Two-Level of Time Constraints in The Back-End of Wafer Fabrication," International Journal of Production Research, Vol. Vol.47, No. No. 23, pp. 6967-6979. (SCI)

 
 

Ying-Mei Tu, Chun-Wei Lu and Sheng-Hung Chang (2009), "Model To Determine A General X-Factor Contribution And Apply To Cycle Time Improvement For Wafer Fabrication," Int. J. Services Operations and Informatics, Vol. Vol. 14, No. No. 3, pp. 272-291. (EI)

 
 

Ying-Mei Tu, Hsin-Nan Chen and Sheng-Hung Chang (2010), "The Design of KPI on Technology Development of Wafer Foundry," Journal of the Chinese Institute of Industrial Engineers, Vol. Vol. 27, No. No. 5, pp. 351-362. (EI)

 
 

Ying-Mei Tu, Hsin-Nan Chen (2010), "Capacity Planning With Sequential Time Constraints Under Various Control Policies in The Back-End of Wafer Fabrications," Journal of Operations Research Society, Vol. Vol. 61, No. No. 8, pp. 1258-1264. (SSCI)

 
 

Ying-Mei Tu, Hsin-Nan Chen and Tsai-Feng Liu (2010), "Shop-Floor Control Model of Wafer Fabrication for Batch Operations with Time Constraints," International Journal of Industrial Engineering-Theory, Applications and Practice, Vol. 17, No. 2, pp. 142-155. (SCI)

 
 

Amy H. I. Lee, Chun-Yu Lin, Shu-Ru Wang and Ying-Mei Tu (2010), "The construction of a comprehensive model for production strategy evaluation," Fuzzy Optimization and Decision Making, Vol. Vol. 9, No. No. 2, pp. 187-217. (SCI)

 
 

 

Conference Paper
 

Ying-Mei Tu, Rong-Kwei Li " (1990), "Composite Feature and Variational Geometry Concepts on Feature-based Design System," 79 Annual Conference of Chinese Institute of Industrial Engineers, Vol. ROC, No. , pp. -. (TSSCI)(In Chinese)

 
 

Ying-Mei Tu, Sheng-Hung Chang and Rong-Kwei Li (1998), "WIP Profile Determination Model for Wafer Foundry," 87 Annual Conference of Chinese Institute of Industrial Engineers, Vol. ROC, No. , pp. -. (TSSCI)(In Chinese)

 
 

Ying-Mei Tu, Yu-Hsiu Chao (2001), "Capacity Backup Model for Wafer Foundry," 90 Annual Conference of Chinese Institute of Industrial Engineers, Vol. ROC, No. , pp. -. (TSSCI)(In Chinese)

 
 

Ying-Mie Tu and Hsin-Nan Chen (2003), "The influence of forecasting accuracy and information sharing of collaboration in supply chain"," 2003 International Conference on Industrial Engineering & Engineering Management, Vol. China, No. Shang-Hai, pp. 239-239. (TSSCI觀察名單)

 
 

Ying-Mei Tu, Yu-Hsiu Chao, Sheng-Hung Chang (2003), "Performance Evaluation Model for Wafer Foundry Under Capacity Backup," 92 Annual Conference of Chinese Institute of Industrial Engineers, Vol. ROC, No. , pp. -. (TSSCI)(In Chinese)

 
 

Li-Yu Weng, Sheng-Hung Chang, Ying-Mei Tu and Rong-Kwei Li (2004), "Apply TOC on Distribution Management," 93 Annual Conference of Chinese Institute of Industrial Engineers, Vol. ROC, No. , pp. -. (TSSCI)(In Chinese)

 
 

Zhi-Han Lin, Sheng-Hung Chang, Ying-Mei Tu and Rong-Kwei Li (2004), "Research on Bottleneck Shift," 93 Annual Conference of Chinese Institute of Industrial Engineers, Vol. ROC, No. , pp. -. (TSSCI)(In Chinese)

 
 

Ying-Mei Tu, Hsin-Nan Chen (2005), "The Influence of Machine Downtime in a Queuing System - A Simulation Study," APIEMS 2005 CONFERENCE, Vol. Philippines, No. MANILA, pp. -.

 
 

Ying-Mei Tu, Chuen-Shiuan Liou and I-Huei Chang (2005), "Capacity Determination Model of Batch Processing in Semiconductor Wafer Fabrication under Time Constraints," 94 Annual Conference of Chinese Institute of Industrial Engineers, Vol. ROC, No. Hsin-Chu, pp. 209-220. (TSSCI)(In Chinese)

 
 

Ying-Mei Tu, Tsai-Feng Liu (2005), "Shop Floor Control of Batch Machines Under Time Constraints," 94 Annual Conference of Chinese Institute of Industrial Engineers, Vol. ROC, No. Hsin-Chu, pp. 209-220. (TSSCI)(In Chinese)

 
 

Po-Hsien Kuo, Sheng-Hung Chang, Ying-Mei Tu and Rong-Kwei Li (2005), "A Research on Decision Support System for New Product Project Portfoli," 94 Annual Conference of Chinese Institute of Industrial Engineers, Vol. ROC, No. Hsin-Chu, pp. -. (TSSCI)(In Chinese)

 
 

Ying-Mei Tu, Hsin-Nan Chen (2005), "The Influence of Machine Downtime Duration in Production Performance," 94 Annual Conference of Chinese Institute of Industrial Engineers, Vol. ROC, No. Hsin-Chu, pp. -. (TSSCI)(In Chinese)

 
 

Ying-Mei Tu and Ying-Yu Huang (2005), "Shop Floor Control Model for Wafer Foundry Under Time Constraints," 93 Annual Conference of Chinese Institute of Industrial Engineers, Vol. ROC, No. , pp. -. (TSSCI)(In Chinese)

 
 

Ying-Mei Tu, Hsin-Nan Chen (2006), "Waiting Time Approximation with Resource Failure," International Conference of Pacific RIM Management, Vol. USA, No. Hawaii, pp. -.

 
 

Ying-Mei Tu, Chun-Wei Lu (2006), "Model to Determine the Hot Run Ratio of a Wafer Fabrication Factory under Time Constraints," International Conference of Pacific RIM Management, Vol. USA, No. Hawaii, pp. -.

 
 

Huan-Chung You, Ying-Mei Tu, Joseph Z. Shyu (2006), "Strategic Clustering of Innovation in Catching up Economies," 15th International Conference on Management of Technology, Vol. China, No. Beijing, pp. -.

 
 

Ying Mei Tu & Chiu-Ling Chen (2006), "The Influence of Arrival Smoothing between Batch and Serial Processes on System Performance," The 7th Asian Pacific Industrial Engineering and Management Systems Conference, Vol. Thailand, No. Bangkok, pp. -.

 
 

Ying-Mei Tu, Hsin-Nan Chen (2007), "Model to Determine the Capacity of a Wafer Foundry with Sequential Time Constraints," International Conference of Pacific RIM Management, Vol. USA, No. Las Vegas, pp. -.

 
 

Ying-Mei Tu, Hsin-Nan Chen (2008), "Shop-Floor Control Model in Batch Processes of Wafer Fabrication with Time Constraints," 19th Annual Conference of the Production and Operations Management Society, Vol. USA, No. , pp. -.

 
 

Ying-Mei Tu, Hsin-Nan Chen (2008), "The Effect of Downtime Frequency at Fixed Machine Availability in Queuing Systems," 2008 IEEE International Conference on Service Operations and Logistics, and Informatics, Vol. China, No. , pp. -.

 
 

Ying-Mei Tu, Chun-Wei Lu (2008), "A General X-Factor Determination Model for Wafer Fabrication”, 2008 IEEE International Conference on Service Operations and Logistics, and Informatics," 2008 IEEE International Conference on Service Operations and Logistics, and Informatics, Vol. China, No. , pp. -.

 
 

Ying-Mei Tu (2008), "Capacity Planning for Batch-Serial Processes with Time Constraints in Wafer Fabrication," 2008 Global Business & International Management Conference, Vol. USA, No. Portland, pp. -.

 

Projects
  Constraint Time Buffer Determination Model
(89-2213-E-216-047-)
 
  A Capacity Backup Determination Model for Wafer Foundry
(90-2218-E-216-001-)
 
  Demand forecasting and inventory management for spare parts---for optoelectronics equipment vendor
(93-2622-E-216-018-CC3)
 
  BI System Development Based on TOC Performance Measurement Method
(94-2213-E-009-077-)
 
  Research on The Feasible Version of Broken Market Constarints---TOC Method
(95-2221-E-009-191-)
 
  Model to Determine the Capacity of a Wafer Foundry with Sequential Time Constraints
(aaa)
 
  Capacity Planning and Shop Floor Control Model for Wafer Fabrication Under Time Constraints (II)
(96-2221-E-216-038-)
 
  Model to Determine the Production Support for Twin Fabs
(97-2221-E-216-031-MY2)
 
  Multi-Project Planning and Control Methods to Effectively Shorten R&D Duration and Work-in-Progress (I)
(96-2221-E-159-001-)
 
  Integrated Strategic Planning and Shop Floor Control for Wafer Fabrication and Flip Chip(I)
(NSC 99-2221-E-216-029)
 
  The Impact Analysis of Opening Projects and Resource Loading on Project Performance
(99-2221-E-159-007)